0

Pet Collar Leash Harness Set Adjustable Non Pull Ultra Long Lead 63" Heavy Duty Training Set 3 Pack High Visibility No Choking for Small Medium Large Dog Puppy - B06ZZYLV6D

  • Model: B06ZZYLV6D
  • 627 Units in Stock
Color:
    • Pet Collar Leash Harness Set Adjustable Non Pull Ultra Long Lead 63" Heavy Duty Training Set 3 Pack High Visibility No Choking for Small Medium Large Dog Puppy - B06ZZYLV6D
    • Blueberry Pet Durable 3M Reflctive Dog Lead 150 cm x 2cm in Mahogany Brown Medium Leads for Dogs Matching Collar Available Separately - B018703CEA
    • Petface Dog Training Lead - B00OQ1YGGI
    • Dog & Field™ 10 Meter Biothane Round Training Lead/Tracking Line For Pet Recall and Behavioural Training (Green) - B07F9WDNKJ
    • EzyDog Vario 4 in 1 LITE Multifunctional Dog Lead Training Leash Blue - B017LYTWZ6
    • Grand Line Nylon Pet Leash Rope with Comfortable Padded Handle for Small Medium Dogs and Cats - 1.5m Long Red - B07D74YV3T

£77.27  £15.06
Save: 81% off

Add to Cart:

Please Choose:



Pet Collar Leash Harness Set Adjustable Non Pull Ultra Long Lead 63" Heavy Duty Training Set 3 Pack High Visibility No Choking for Small Medium Large Dog Puppy - B06ZZYLV6D
   Rated 4.8   reviews [112]

  • Package includes: Adjustable harness + 160cm leash lead + Adjustable Collar. Perfect set convenient and safe for walking, running, training, and simply playing

  • Durable rope to make this a long-lasting leash so you and your dog can enjoy years of walks together. Super long leash, 63". High visible color for safe

  • Nylon braided harness, leash and collar, extremely strong and durable, for heavy duty work to support puppy's body safely and comfortably. The dog leash and non-pull collar/ harness make your life easier while running/ walking with your dog

  • Ergonomic designed and well made handle/ hand loop, soft on hands, easy to grip and wear-resistant. The clip easily attach to the collar/ harness and quick release

  • The metal part of the set, made of premium zinc alloy with chrome plating, long lasting to use and anti-rust. The set is easy to control your dog & make them come along, without the harness slipping off the shoulders

  • Size Name:M, Chest: 21.5"-27.5"  |  Colour Name:Black Harness + Leash + Collar

    Brilliant design for those "no I don't want to walk in that direction" moments, easy to control your dog & make them come along, without the harness slipping off the shoulders!! It's convenient and safe for walking, running, training, and simply playing. Professional safely designed harness and collar with Ergonomic designed Nylon braided leash, make your life easier while walking the dog. Whole set is no choking and no pull harm to puppy's skin and hair, provides ultimate comfort for dogs.

    Size Information:

    XS: Chest: 11.8"-17.7", Collar: 11"-13.4", Width: 0.6"; Leash Length: 63", Width: 0.6",
    recommend for weight under 19 lb, Chihuahua,Dachshund, Miniature Schnauzer Terrier, Poodle, Pom

    S: Chest: 15.5"-23.6", Collar: 13"-16.5", Width: 0.8"; Leash Length: 63", Width: 0.6",
    recommend for weight under 33 lb, Papillon, Pekingese, Pug

    M: Chest: 21.5"-27.5", Collar: 16.5-20.5", Width: 1.2"; Leash Length: 63", Width: 0.6",
    recommend for weight under 77 lb, Cocker Spaniel, Labrador,Corgi

    L: Chest: 25.5"-31.5", Collar: 19.5"-24.8", Width: 1.6"; Leash Length: 63", Width: 0.6",
    recommend for weight under 154 lb, Husky, Golden Retriever, Rough collie, Samoyed, Chow Chow, Sheepdog.

    Tip: It's proposed to reserve a certain length of the collar strap to increase the friction force between the buckle and the strap to prevent the dogs from shaking off and eating the collar



    Liying dog leashes provides you the benefits below:
    1: Pet leashes connect you and your pet, make you the master whether you are in walking, running,
    jogging or hiking.
    2: It's a great tool to use for vet visits or even as a temporary hook up when dining.
    3: Various sizes can be applicable for different size dogs.

    Package Includes: 1*Pet Harness + 1*Lead +1*Collar

    Pet Collar Leash Harness Set Adjustable Non Pull Ultra Long Lead 63" Heavy Duty Training Set 3 Pack High Visibility No Choking for Small Medium Large Dog Puppy - B06ZZYLV6D


    button-top.png